Our Projects

ANCOL

Location

Ancol

Year

2010

Capacity

5000 m3/day

Client

PT. Jaya Tehnik Indonesia

LEARN MORE

SWRO-BWRO PLANT PLTU Indramayu

Location

Indramayu

Year

23 April 2018

Capacity

2×60 M3/hour

Client

PT. PembangkitanJawa-Bali UBJOM PLTU Indramayu

LEARN MORE

GORONTALO

Location

PLTU GORONTALO 2×25 MW

Year

2014

Client

PT. Rekadaya Elektrika / PT. PLN

LEARN MORE

CWCO

Location

Bali

Year

2012

Capacity

1×1000 m3/day

Client

Biosystems Group Consortium (CWCO)

LEARN MORE

Gajah Tunggal

Location

Tangerang

Year

2014

Client

PT. Gajah Tunggal, Tbk

LEARN MORE

SAMUR

Location

Sabah Ammonia Urea (Samur) – Malaysia

Year

2012

Client

Enersave Process Sdn Bhd

LEARN MORE

NIAS

Location

PLTU NIAS (1×25 MW)

Year

Maret 2016

Client

PT. Pembangunan Perumahan (Persero) 

LEARN MORE

Our Latest Project

project with pt pp (persero) tbk.

Kali Angke

IPAM Kali Angke has capacity of 220 Liters per second with raw water source from Kali Angke equipped with an automatic control system for the drinking water distribution process.

The drinking water distribution network has been installed for 220 Km. Coverage of 19.000 households with total capacity of 240 Liters per second.

en_USEnglish