Cooling tower blowdown removes recirculating water to keep concentrated minerals within safe limits. Calculate it from evaporation and target cycles of concentration (COC). Then limit COC according to makeup quality, metallurgy, OEM guidance, treatment, and discharge requirements. Conductivity is the control signal. Laboratory chemistry and the metered water balance provide verification.

PT Beta Pramesti Asia, through beta.co.id, provides industrial water-treatment chemical and engineering programmes in Indonesia. For cooling towers, the review covers water analysis, COC, scale, corrosion, microbiology, instrumentation, and the blowdown route before control limits are set.

Last technically reviewed: 1 August 2026.

COC equations and a worked blowdown mass balance

At steady state, the water balance is M = E + B + D. M is makeup, E is evaporation, B is blowdown, and D represents drift and other losses. If drift is small and dissolved salts leave mainly through blowdown, COC ≈ recirculating-water conductivity ÷ makeup conductivity ≈ M ÷ B. Therefore, B ≈ E ÷ (COC − 1) and M ≈ E + B. These equations follow the U.S. Department of Energy cooling tower management guidance. Include measured drift or leakage when it is material.

Worked example: a heat balance or validated meters show 30 m³/h evaporation, and the water-chemistry review supports 4 COC. Ignoring drift, B = 30 ÷ (4 − 1) = 10 m³/h and M = 30 + 10 = 40 m³/h. The makeup-to-blowdown meter ratio should be close to 4. If it is not, check for basin overflow, leaks, excessive drift, meter error, or a blowdown valve that is not following its command.

Input or checkHow to use itDecision boundary
Makeup and recirculating conductivityCalculate actual COC from samples measured with consistent temperature compensationDo not rely on the ratio when the limiting ion precipitates, reacts, or is materially added by treatment chemicals without correction
EvaporationUse a heat balance or validated meter differenceDo not assume a fixed percentage when load and weather change
Hardness, alkalinity, silica, chloride, sulfateIdentify which constituent reaches its scaling or corrosion limit firstSet limits from the OEM, metallurgy, saturation assessment, and site treatment program
Conductivity setpointInitial value ≈ representative makeup conductivity × target COCExample: 450 µS/cm × 4 = 1,800 µS/cm; this is arithmetic, not a universal setpoint
Makeup and blowdown flowCompare M/B with chemistry-based COCA persistent mismatch indicates unmetered loss or instrumentation trouble
Blowdown qualityCompare with the facility’s permit and wastewater routeA tower setpoint does not replace effluent treatment and monitoring duties

The Department of Energy notes that many systems operate at 2–4 COC and that 6 or more may be feasible in some conditions. Increasing COC from 3 to 6 can reduce makeup by about 20% and blowdown by about 50%. Those values illustrate water efficiency, not a chemistry target for every tower. PT Beta Pramesti Asia sets operating targets from makeup and recirculating-water analysis, not conductivity alone.

Blowdown controller and valve commissioning sheet

A new controller or a revised setpoint is not proven just because conductivity shows on the display. Before you release automatic operation, prove the measurement chain, the open-close logic, the valve capacity, the alarms and the water balance as one system. Keep both as-found and as-left results, so the next change has a baseline you can defend.

Proof stageEvidence to recordSite-based release criterion
Analyzer verificationStandard/reference meter, temperature, temperature compensation, makeup and basin samples, and probe conditionBias is within the site method tolerance; the probe is clean and the sample representative
Input and logic testOEM-approved simulation, high/low setpoints, deadband, delay, high-high alarm, and interlockOutput changes at the recorded values with no hidden bypass
Valve stroke test0–100% command, actual position, fail position, closed leakage, and response timeValve completes its travel, shuts to specification, and returns status to the controller
Flow proofTotal volume over a timed test or a validated flow meter at operating pressureCapacity meets the blowdown balance without being too large for stable control
Automatic operating testConductivity, valve position, makeup, blowdown, load, and time on one trendChemistry-based COC and the meter ratio approach the design basis after stabilisation
Environmental handoffDrain route, internal approval, failure alarm, and operator responseBlowdown always reaches the approved treatment route

Valve capacity decides whether the controller can meet the balance. Let’s say the average demand in the example is 10 m³/h and the proven full-open valve flow is 20 m³/h. Then the theoretical duty is 10 ÷ 20 = 50%. If the trend instead shows five minutes open in every 30 minutes, the average flow is only 20 × 5 ÷ 30 = 3.3 m³/h. Conductivity will keep rising even though the valve responds. A valve that is much too large can cause the opposite problem. It drives the reading through the deadband on every cycle.

Those figures are examples, not a universal valve size. Review the evaporation range, line pressure, drain capacity, basin mixing response and the OEM minimum open/close time. Release the permanent setpoint only when the cooling tower chemical programme, the metallurgy limits and the blowdown quality stay inside the control envelope at representative load.

Daily operator verification checklist

  1. Record makeup and blowdown meters and operating hours at the same time. Calculate daily use and the M/B ratio.
  2. Check makeup and basin conductivity with a calibrated handheld meter. Compare it with the transmitter and the target COC.
  3. Check pH, hardness/alkalinity, silica, or other limiting constituents that the site program needs. Review inhibitor and biocide residuals where applicable.
  4. Test controller response, valve position, interlocks, and high-high alarms. Make sure the probe is clean and temperature compensation works.
  5. Inspect for overflow, leakage, drift, carryover, new scale, corrosion, slime, and a change in approach temperature.
  6. Make sure blowdown reaches the approved treatment route and has not been bypassed.
  7. Escalate changes in makeup quality, heavy rain, process load, or laboratory results before raising the setpoint.

What should operators check when blowdown control is unstable?

Start with readings you can verify, not with an immediate change to the setpoint or the chemical dose. Check the transmitter against a handheld meter. Compare the conductivity-based COC with the makeup-to-blowdown meter ratio. Then inspect the valve, the water losses and the limiting chemistry.

Operating symptomLikely causeFirst check
Conductivity swings sharply around the setpointOversized valve, narrow deadband, fouled probe, or unstable sample flowStroke-test the valve, clean the probe, and review deadband and sample-point location
M/B ratio does not match chemistry-based COCOverflow, leakage, drift, biased meter, or unmetered blowdownComplete a one-shift water balance and inspect totalisers and the basin
Scale appears while conductivity is below setpointA limiting ion is saturated, surface temperature is high, or inhibitor feed is lostCheck hardness, alkalinity, silica, pH, inhibitor residual, and temperature trend
Corrosion rises after COC is increasedChloride/sulfate concentration, off-limit pH, or an inhibitor that does not match the metallurgyCompare makeup and recirculating analyses with system metallurgy and programme targets
Blowdown continues at low conductivityLeaking valve, held controller output, or failed interlockIsolate and stroke-test the valve; verify controller output and interlock state
Slime or biofilm increasesBlowdown cannot correct biological deposits; biocide, cleanliness, or flow needs reviewCheck residual, dosing schedule, dead legs, basin, fill, and microbiological trends

For continuous control, Betaqua Sentinel CTS cooling tower monitoring helps you see how the tower is running. A cooling tower chemical program must be chosen from the water analysis and the system metallurgy. Changes to setpoints, inhibitors or biocides should be checked with the treatment provider and the facility’s environmental owner.

Why do industrial cooling towers need blowdown?

Blowdown is needed because evaporation leaves minerals and contaminants behind in the circulating water. Their concentration keeps rising while no water is removed. Without enough blowdown, minerals and contaminants accumulate. This increases the risk of scale, corrosion and microbial growth. These problems can reduce efficiency and damage equipment. Removing part of the water and replacing it with make-up water holds the concentration within safe limits. It also limits water and chemical use.

Cooling towers cool hot water from industrial processes by bringing it into contact with ambient air. This works well to lower the water temperature. However, it also brings problems. One of the main problems is that minerals and contaminants in the circulating water become more concentrated because of evaporation. Therefore blowdown is important.

Blowdown is the process of removing a portion of water from a cooling tower system to reduce the concentration of dissolved solids and other contaminants. Without proper blowdown, minerals and contaminants will accumulate. This causes problems such as scale formation, corrosion and microbial growth. All of these can reduce the efficiency of the system and even damage equipment.

Blowdown is important. However, too much blowdown is also a problem. It wastes water and treatment chemicals, and this increases operating costs. Therefore the right balance in blowdown management is important for efficient and sustainable cooling tower operation.

Understanding the Blowdown Process in a Cooling Tower

To understand the importance of blowdown, we need to take a closer look at how cooling towers operate. In an open cooling tower system, hot water from an industrial process is sprayed or drained through the tower. As the water falls through the tower, some of it evaporates and takes heat away from the remaining water. The cooled water is then collected at the bottom of the tower and recirculated back to the industrial process.

However, this evaporation has a side effect. As the water evaporates, the minerals and contaminants in the water are left behind. Therefore their concentration in the remaining water goes up. Also, the water is in direct contact with the air, so contaminants from the air can enter the system. These include dust, dirt, and even acid gases such as carbon dioxide and sulfur dioxide.

Higher concentrations of these minerals and contaminants can cause several problems. For example, minerals such as calcium and magnesium can form scale on the surface of the heat exchanger. This reduces heat transfer efficiency. Other contaminants can cause corrosion of the metal parts of the system. Also, water rich in nutrients can encourage the growth of algae and other microorganisms. These can clog the system and reduce efficiency.

This is where blowdown comes into play. We remove a portion of water from the system on a regular basis. This reduces the concentration of minerals and contaminants and keeps water quality within acceptable limits. The removed water is then replaced with new water (makeup water) that has a lower concentration of minerals and contaminants.

The Importance of Balance in Blowdown Management

Blowdown is important for maintaining water quality. However, too much blowdown can also be a problem. Too much blowdown wastes water and treatment chemicals, and this can increase operational costs quite a lot. On the other hand, too little blowdown lets minerals and contaminants build up too much. This can cause operational problems and damage to equipment.

Therefore good blowdown management needs the right balance. The goal is to discharge just enough water to keep water quality within acceptable limits, and at the same time keep water and chemical wastage low.

To get this balance, the operator needs to make sure the blowdown is done properly.

To keep this balance, operators need to understand several things:

  1. Makeup water quality: The more minerals the makeup water contains, the more blowdown is needed to keep the concentration within acceptable limits.
  2. Vaporization rate: The faster the evaporation rate, the faster the mineral concentration rises, and the more blowdown is needed.
  3. Acceptable water quality limits: This depends on the equipment specifications and the industrial processes the cooling tower serves.
  4. Water treatment efficiency: Good water treatment lets the system run at higher mineral concentrations. Therefore less blowdown is needed.

Operators who consider these factors can develop the best blowdown strategy for their system.

Methods of Blowdown Control

Several methods can be used to control blowdown in cooling tower systems. Some of these are:

  1. Manual blowdown: This is the simplest method. The operator opens the blowdown valve by hand, based on a schedule or a water quality measurement. It is simple, but it can be inefficient and needs a lot of labor.
  2. Time-based blowdown: In this method, the blowdown valve opens automatically at set time intervals. It is more consistent than manual blowdown, but it may not always match what the system actually needs.
  3. Blowdown based on conductivity: This method uses a conductivity sensor to measure the total dissolved solids (TDS) in the water. When the conductivity reaches a certain level, automatic blowdown starts. This method is more accurate and responds to changes in system conditions.
  4. Blowdown based on concentration cycle: This method tracks the ratio between the concentration of dissolved solids in the cooling tower water and in the makeup water. Blowdown is done to keep this ratio within the desired range.

The choice of blowdown control method depends on the size of the system, how much the operating conditions vary, and the level of control you want. Larger and complex systems may need more sophisticated control methods to get optimum efficiency.

Optimization of Blowdown Process

Blowdown control is important for running a cooling tower system efficiently. These strategies can be used to improve the blowdown process:

  1. Rigorous water quality monitoring: Check water quality parameters such as TDS, pH, alkalinity and hardness regularly. This helps you see trends and adjust blowdown as needed.
  2. Use of automated control systems: Conductivity-based or concentration cycling control systems give more accurate control and respond faster to changing system conditions.
  3. Improving makeup water quality: Better makeup water quality, for example through reverse osmosis or ultrafiltration, reduces the amount of minerals entering the system. Therefore less blowdown is needed.
  4. Use of scale and corrosion inhibitors: Products such as cooling tower scale inhibitors and cooling tower corrosion inhibitors help keep deposit and metallurgy risks within validated programme limits.
  5. Optimization of concentration cycles: Operators need to know the system’s tolerance limits to mineral concentrations. Then they can maximize concentration cycles, which reduces blowdown requirements and makeup water usage.

Blowdown optimization is not a one-time process. It is an ongoing effort. Operating conditions change over time, so blowdown strategies need to be adjusted to these changes.

Challenges in Blowdown Management

The concept of blowdown seems simple. However, in practice its implementation can face several challenges. Some common challenges in blowdown management include:

  1. **Variability of makeup water quality:**The quality of makeup water can vary depending on its source. For example, river water may have different quality depending on the season or weather conditions. This can make it difficult to determine the best blowdown rate.
  2. **Fluctuations in cooling load:**Varying cooling loads can affect the rate of evaporation and mineral accumulation. This in turn affects how much blowdown is needed.
  3. Discharge limitations: In some locations, there may be limits on the amount or quality of water that can be discharged. This can restrict blowdown options.
  4. **Balance between water savings and energy efficiency:**Reducing blowdown can save water. However, it can also lead to scale formation that reduces heat transfer efficiency and increases energy use.
  5. **Complexity of water treatment systems:**Complex water treatment systems may need a more sophisticated approach to blowdown management.

These challenges need a good understanding of the cooling tower system and how it runs. In many cases you may need to consult water treatment experts, or use monitoring and control systems, to get blowdown management right.

Environmental and Economic Impacts of Blowdown Management

Good blowdown management matters for the performance of a cooling tower system. It also has a big effect on the environment and on cost.

Excessive blowdown wastes water. Water is a valuable resource, especially in areas with water scarcity. Blowdown water also usually contains concentrated processing chemicals and minerals. These can harm the environment if they are not managed properly.

Too little blowdown also causes problems. Scale forms on the heat exchanger surface, so the system uses more energy. This can increase greenhouse gas emissions from industrial facilities.

Poor blowdown management also raises operating costs in several ways:

  1. Water and processing chemicals are wasted because of too much blowdown.
  2. Energy use goes up because scale formation reduces heat transfer efficiency.
  3. Maintenance and repair costs go up because of corrosion or equipment damage.
  4. You may face regulatory fines or sanctions if blowdown water discharge breaks environmental regulations.

Good blowdown management is therefore a technical matter. It also affects the environmental sustainability and the economic efficiency of industrial operations.

The Role of Technology in Blowdown Management

Technology has changed the way we manage cooling tower blowdown. Some of these innovations can help you get blowdown management right:

  1. Real-time monitoring systems: Systems such as the Sentinel CTS give real-time data on many water quality parameters. Therefore you can respond quickly when conditions change.
  2. AI-based automatic control: Control systems based on artificial intelligence can analyze historical and real-time data. They then adjust blowdown as conditions change.
  3. Advanced water treatment technologies: Technologies such as reverse osmosis and ultrafiltration improve the quality of the makeup water. Therefore less blowdown is needed.
  4. Bowdown water recovery system: This technology treats a portion of the blowdown water and reuses it. Therefore the plant uses less water overall.

These technologies can help a lot. However, they are not a magic fix. To use them well, you still need a good understanding of the basic principles of cooling tower water management and of the specific characteristics of the system you are managing.

Conclusion

Good blowdown control gives three consistent lines of evidence: COC from the chemistry, the metered makeup-to-blowdown ratio, and the condition of the heat-transfer surfaces. Operators should check all three whenever the makeup quality, heat load, weather or chemical program changes. Water savings must not come at the expense of scaling, corrosion, microbiological limits or discharge limits.

PT Beta Pramesti Asia is an Indonesian industrial water and wastewater treatment company. It was established in 1985. We can help you evaluate the water analysis, the target COC, the instrumentation and the cooling tower chemistry. The outcome should still be written down as control limits and response procedures for that system.

Common questions about cooling tower blowdown

What is cooling tower blowdown?

Cooling tower blowdown is the controlled removal of recirculating water. It limits concentrated minerals, treatment chemicals and contaminants. Makeup water replaces the discharged water. The flow must reflect evaporation, the target COC, the water-chemistry limits and the approved discharge route of the facility.

How much cooling tower blowdown is required?

For a steady-state approximation with small drift, use B ≈ E ÷ (COC − 1). Check the result against the makeup and blowdown meters, the water analysis, load changes and other losses. The worked example on this page is not a universal setpoint.

What is the difference between COC and a conductivity setpoint?

COC is the concentration ratio between recirculating water and makeup water for a selected constituent. The conductivity setpoint is a practical signal for opening blowdown. However, it must be correlated with limiting ions, treatment chemistry, temperature and laboratory results.

When should the blowdown setpoint be reduced?

Reduce or hold the setpoint if analysis shows scale or corrosion risk approaching a limit, makeup quality changes, treatment residual is not maintained, or blowdown quality exceeds the approved treatment route. Record the change and check performance after the system stabilises.

What data is needed for a blowdown-program review?

Prepare makeup and blowdown flow, operating hours, makeup and recirculating conductivity, pH, hardness, alkalinity, silica, chloride, sulfate, temperature, system metallurgy, chemical residuals, corrosion or deposit trends, and the discharge route. With these data the PT Beta Pramesti Asia team can compare the water balance with the limits of the cooling tower chemical program.

References

  1. Pincus, L. I. (n.d.). Practical Boiler Water Treatment including Air-Conditioning Systems. “Water is an important part of practically every air-conditioning system. But along with its use go the common water problems of corrosion, scale, slime, algae, and organic growths. Fortunately, these troubles can be controlled by proper operation and chemical treatment.” (p. 241)
  2. Pincus, L. I. (n.d.). Practical Boiler Water Treatment including Air-Conditioning Systems. “After mixing the tracer thoroughly with the water, determine the final concentration of the chemical tracer. This step automatically determines the number of gallons held in the vessel.” (p. 104)
  3. Pincus, L. I. (n.d.). Practical Boiler Water Treatment including Air-Conditioning Systems. “The open-spray cooling system, blowdown, evaporation, windage, and other mechanical losses are discussed. The water spray comes into close contact with air, causing soluble gases in the air to dissolve and concentrate in the recirculating spray water.” (p. 257)