Inside the power industry's quiet water war: why CCGT plants are eyeing zero liquid discharge

beta-pramesti-asiaindustry-power-generation-combinedprocess-ccgt

Inside the power industry's quiet water war: why CCGT plants are eyeing zero liquid discharge

In regions with little water, combined-cycle gas turbine plants are looking at zero liquid discharge to reuse scarce water and reduce regulatory risk. The cost depends on a hard choice between evaporation ponds, brine concentrators and crystallizers. The numbers are unforgiving.

Industry: Power_Generation_(Combined_Cycle_Gas_Turbine_ | Process: _CCGT)

A 250 MW power plant in the U.S. West found out the hard way that evaporation ponds can become a financial sinkhole. Its groundwater total dissolved solids (TDS, a measure of salts) jumped from 500 to 2,500 mg/L. Therefore the site's three 35-million-gallon ponds effectively doubled beyond design. Draining one by truck worked out at about $0.50 per gallon, about $130 per m³, or $17 million per pond (watertechnologies.com).

The operator did not shut down. It installed treatment to reclaim the water. Over two years it recovered ~60 million gallons for reuse and "saved over $20 million" in avoided hauling and outage costs (watertechnologies.com).

That case study is a warning for combined‑cycle gas turbine (CCGT) plants. Their wastewater streams include [cooling‑tower blowdown, boiler blowdown](https://beta.co.id/en/blog/inside-the-quiet-workhorse-of-a-ccgt-how-online-control-and-maintenance-turn-blowdown-into-compliance-heat-and-savings), condensate polishing waste, ion‑exchange regenerants and chemical cleaning effluents (text-id.123dok.com). On sites that use condensate polishing, the waste from a condensate polisher and from ion‑exchange resin regenerations is part of the mix.

In water-stressed regions, even CCGTs with air-cooled condensers are being pushed toward minimal discharge because freshwater is scarce or costly. Policies are tightening worldwide. New Chinese power plants need to include zero liquid discharge (ZLD). In India's Tamil Nadu, ZLD is mandated in industry (powermag.com).

Regional water stress and Indonesian rules

Southeast Asia faces a serious water gap. Demand is projected to exceed supply by about 40% by 2030. The same source notes that investment interest could exceed $27 billion by 2025 (southeastasiainfra.com). Indonesia already has water stress in many areas (southeastasiainfra.com). Environmental regulators also enforce effluent limits. For example, Ministry Regulation 08/2009 sets discharge standards for cooling and boiler blowdown (text-id.123dok.com).

Critics say the standards are still weak, particularly for discharges to the sea. Therefore the rules remain uncertain (mongabay.co.id). Some provinces may set stricter limits (text-id.123dok.com). ZLD removes liquid effluent entirely. Therefore it is a strategic hedge.

ZLD definition and market momentum

Zero liquid discharge (ZLD) means treating wastewater so no liquid effluent leaves the site. All water is recovered or evaporated, and only solid residues remain. It can lower freshwater intake a lot by [recycling blowdown — turning wastewater into a resource](https://beta.co.id/en/blog/power-plants-are-turning-cooling-tower-waste-into-a-resource-and-edging-toward-zero-liquid-discharge) (smartwatermagazine.com).

The global ZLD technology market was about $1 billion in 2021 and is growing about 12% per year. Scarcity and stricter discharge limits drive this. Many industries are moving toward ZLD or near-ZLD (MLD, minimum-liquid discharge) systems (smartwatermagazine.com).

In power, designers are analyzing MLD options more and more because “removing the last fraction of water… adds much cost and complexity” (power‑eng.com). U.S. studies in the 2000s benchmarked costs for each ZLD stage (pretreatment, brine concentration, crystallization). Therefore designers can compare ZLD with alternatives like deep‑well injection or ponds (powermag.com) (powermag.com).

Evaporation ponds: low energy, high land

Evaporation ponds let water evaporate in lined basins and leave brine or a salt crust. They need no external energy and are simple to run. However, they need a large area and a favorable climate. In the 250 MW case, hauling a full pond at ~$0.50 per gallon (≈$130/m³) would have cost ~$17 million per pond. Therefore emergency disposal was prohibitive (watertechnologies.com).

Ponds can leak if the lining is not done carefully. Then they can contaminate soil or shallow aquifers (power‑eng.com). Algae and bacteria can also grow and degrade the water quality (watertechnologies.com). For solids control upstream of ponds or membranes, many plants still use a clarifier to remove suspended matter.

Brine concentrators: thermal heavyweights

Brine concentrators evaporate water with multi‑effect evaporators (MEE) or mechanical vapor compression (MVC). These units are usually installed after the membranes. They can recover 80–95% of the wastewater as condensate (smartwatermagazine.com) (powermag.com). In power projects, streams have been concentrated from ~35,000 mg/L TDS to ~220,000 mg/L (22–25%) with >80% recovery (powermag.com).

Scaling control is important. Common scales include CaSO₄ and CaCO₃. Operators use “seeded slurry” MEE designs and membrane trains to keep the plant running smoothly (powermag.com) (powermag.com). Upstream hardness control can include nano‑filtration or a softener. Antiscalant dosing on RO/NF/UF membrane systems is routine. Dosing precision usually relies on a dosing pump and special membrane antiscalants.

Capital costs are sizable. One analysis put ZLD (pretreatment + evaporation + crystallization) at about 3× the cost of a simpler train at 200 gpm. However, optimized designs (omitting a forced‑circulation crystallizer) could cut the premium to 40–50% (power‑eng.com) (power‑eng.com). Energy is the main driver. Pilots report total electrical energy around 10–12 kWh per m³ treated (pmc.ncbi.nlm.nih.gov), which inflates O&M. An Oman study found a levelized cost of ~$7.85/m³ for a conventional evaporator‑crystallizer ZLD system (mdpi.com).

Concentrators produce high‑quality distillate. Therefore most of the recovered water can go back as boiler feed or cooling makeup. A brackish‑water RO front end usually pairs well with these applications. The remaining brine is usually about 30–50 g/L after concentration. It is much smaller in volume and can be disposed of or sent to a crystallizer.

Crystallizers: the last mile to solids

Crystallizers drive the final brine to salt precipitation. This gives "true" ZLD, where the water leaves as solids, at very high cost. One coal plant ran at 750 MW with 200 gpm of flue‑gas desulfurization (FGD) flow. Full ZLD there generated solids that needed disposal, and operating costs were estimated at $32.82 per 1,000 gallons, about $8.7/m³ (power‑eng.com).

By contrast, evaporating only to a thick brine and disposing of it (for example, mixed into fly ash) reduced O&M to $4.37 per 1,000 gallons, about $1.2/m³ (power‑eng.com). So forcing crystallization can multiply energy and cost by about eight times compared with concentration alone. CAPEX is significant as well. One review found a full evaporator/crystallizer package about 40% more expensive than a simple biological treatment for 200 gpm flow. An earlier estimate put it at about 3× (power‑eng.com) (power‑eng.com).

There is some upside in the byproduct. A pilot vacuum crystallizer recovered about 80% pure NaCl at a scrap value of roughly €20 per ton. Mixed salts were not valuable (pmc.ncbi.nlm.nih.gov). Most ZLD projects still focus on water recovery and compliance. The solids are co‑disposed under solid‑waste rules.

Comparative performance and trade‑offs

  • Land and climate: Ponds need large areas and dry conditions. If the air is humid or it rains, evaporation can stall. They are low‑tech, but they do not work where space or evaporation is limiting (power‑eng.com). Thermal units take little space, but they need a lot of energy.
  • Water recovery: Thermal and membrane concentrators usually recover about 80–95% of the water (smartwatermagazine.com) (powermag.com). Ponds can reach similar fractions in the end, but slowly. Crystallizers recover essentially 100% because they turn the last liquid into solids.
  • Energy use: Ponds use no external energy. MEE and MVC systems use about 5–10 kWh/m³, mostly for boiling. One study found the MED+crystallizer step took about 86% of the total ZLD energy at ≈10 kWh/m³ (pmc.ncbi.nlm.nih.gov).
  • Costs: Partial concentrate disposal can be relatively cheap (~$1–2/m³). Full crystallization runs ~$8–9/m³ (power‑eng.com). Emergency hauling can dwarf both. In the pond case, trucking cost about $132/m³ (watertechnologies.com). Pilots in desalination report levelized ZLD water costs of $7–14/m³. Municipal supply usually costs under $3/m³ (mdpi.com) (mdpi.com).
  • Environmental/risk: Ponds can leak or breach (power‑eng.com). Thermal ZLD removes liquid effluent. However, it concentrates contaminants in solids, and those solids must meet solid‑waste rules.

Cost–benefit calculus for CCGT

The ZLD business case rests on four pillars: CAPEX for equipment, OPEX (primarily energy and chemicals), savings from water reuse, and avoided disposal or penalties. Upstream of reuse, pretreatment trains usually combine ultrafiltration to protect membranes and source conditioning via activated carbon or similar media, especially before membrane systems.

Water value: ZLD returns nearly all water to the plant. In the U.S. pond case, reclaiming ~60 million gallons (~227,000 m³) saved ≈$20 million over two years. That works out to an effective “value” of about $88 per m³ when avoided pumping and outage costs are included (watertechnologies.com). Fresh water is cheap in some places. For instance, municipal water costs ~$2.85/m³ in Oman, so thermal ZLD at ~$7.85/m³ is harder to justify (mdpi.com) (mdpi.com). In Indonesia, raw water from wells or rivers is usually inexpensive or subsidized. Therefore the pure water‑savings argument is weaker.

Disposal or penalty avoidance: Where discharges are regulated or hauling is costly, the ZLD economics improve quickly. The evaporation-pond alternative is trucking at ~$132/m³, and a single pond haul comes close to $17 million. This shows how much is at stake (watertechnologies.com). Avoiding a shutdown also adds to the savings, because the plant keeps selling power (watertechnologies.com). In Indonesia, the law on sea discharges is still not clear (mongabay.co.id). If enforcement changes in the future, the implicit penalties could be substantial.

Byproducts: Salt recovery brings limited revenue. A pilot reported about 80% pure NaCl at about €20/ton (pmc.ncbi.nlm.nih.gov).

Capital and payback: ZLD CAPEX has been estimated at ~1.4–3× a simpler system at moderate flows. For high flows (>500–1000 m³/day), absolute costs scale up (power‑eng.com) (power‑eng.com). One analysis put conventional ZLD payback at ~7.7 years under favorable assumptions (mdpi.com). Sensitivity spans grid electricity, chemicals, local water prices, land, and downtime costs. For RO feed preparation, polishing with a carbon filter and upstream softening help control fouling and scale before high‑recovery trains such as brackish RO.

Operations: ZLD adds complexity, from nutrient build‑up to membrane fouling and scale. Hybrid designs can balance practicality. For example, evaporate to a thick brine and then mix with alkaline ash. In one design, eliminating forced crystallization cut O&M from ~$8.7/m³ to ~$1.2/m³ (from $32.82 to $4.37 per 1,000 gallons). That is an 85% cut in steaming needs (power‑eng.com). Where raw water is brackish, a staged train with membranes and thermal concentration can be configured incrementally.

Bottom line for CCGT planners

Thermal and membrane concentrators usually reach about 90% recovery or more. Therefore a CCGT plant no longer depends on a shrinking freshwater supply (powermag.com) (smartwatermagazine.com). The price is cost and energy. Full ZLD with crystallizers usually costs several dollars per m³ (power‑eng.com) (mdpi.com).

Sometimes water has to be trucked in, or discharged at a high penalty. Sometimes access to water puts generation at risk. In those cases ZLD can give a fast ROI. The U.S. pond case saved about $20 million over two years (watertechnologies.com) (watertechnologies.com). If water is cheap and the regulations are lax, the payback is less clear. Over their lifetimes, ZLD systems have shown payback in under 10 years in many industrial cases (mdpi.com). This is especially true when the discharge options are limited.

For Indonesian CCGTs, prudence suggests modeling conventional treatment alongside ZLD, with local water tariffs, waste handling costs, and likely policy shifts in view. With Southeast Asia’s water constraints intensifying and global momentum building for reuse (southeastasiainfra.com) (powermag.com), eliminating liquid effluent can turn a challenging waste stream into a nearly 100% reclaimed resource. On plants with extensive boiler pretreatment, polishing steps such as a demineralizer or mixed‑bed unit help align recovered water quality with turbine and boiler needs.

Sources: industry and academic case studies and reviews (power‑eng.com) (smartwatermagazine.com) (smartwatermagazine.com) (powermag.com) (power‑eng.com) (watertechnologies.com) (watertechnologies.com) (power‑eng.com), Indonesian regulatory documents (text-id.123dok.com) and regional water‑stress reports (southeastasiainfra.com).