Our Projects


SWRO-BWRO PLANT PLTU Indramayu
Lokasi |
Indramayu |
Tahun |
23 April 2018 |
Kapasitas |
2×60 M3/hour |
Klien |
PT. PembangkitanJawa-Bali UBJOM PLTU Indramayu |

GORONTALO
Lokasi |
PLTU GORONTALO 2×25 MW |
Tahun |
2014 |
Klien |
PT. Rekadaya Elektrika / PT. PLN |

CWCO
Lokasi |
Bali |
Tahun |
2012 |
Kapasitas |
1×1000 m3/day |
Klien |
Biosystems Group Consortium (CWCO) |


SAMUR
Lokasi |
Sabah Ammonia Urea (Samur) – Malaysia |
Tahun |
2012 |
Klien |
Enersave Process Sdn Bhd |

NIAS
Lokasi |
PLTU NIAS (1×25 MW) |
Tahun |
Maret 2016 |
Klien |
PT. Pembangunan Perumahan (Persero) |
Our Latest Project
project with pt pp (persero) tbk.
Kali Angke

IPAM Kali Angke has capacity of 220 Liters per second with raw water source from Kali Angke equipped with an automatic control system for the drinking water distribution process.
The drinking water distribution network has been installed for 220 Km. Coverage of 19.000 households with total capacity of 240 Liters per second.
